EV upload for task and WBS on same time : if we want to organize an EV scope in 10 WBS we 8 lines under each WBS, we need to do 1 upload per WBS, so 10 uploads with 8 lines. and the 8 lines get mixed under each WBS.
It would be better to do 1 upload with 90 lines. And that the line does not get mixed. In EV the line order must be the same order as the upload file.
TOPIC | Event Vision |
Please identify pain points, waste, problems
10 uploads instead of 1 take more time, mixed line does not make sense to understand, quote, perform the work. |